PROJECT SCHEDULING WITH WORK PACKAGES

被引:6
作者
DECKRO, RF
HEBERT, JE
VERDINI, WA
机构
[1] UNIV AKRON,AKRON,OH 44325
[2] ARIZONA STATE UNIV,TEMPE,AZ 85287
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1992年 / 20卷 / 02期
关键词
PROJECT PLANNING; BUDGETING; WORK PACKAGES;
D O I
10.1016/0305-0483(92)90071-E
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The use of work breakdown structures and work packages as a method of disaggregation is a standard approach in many project management procedures. In this study we propose a mathematical programming framework for scheduling project activities with variable durations in a work package environment. The modeling approach has the flexibility to consider budgetary and other operational constraints, is useful in the planning/proposal stage of a project, and provides a systematic method for analyzing the impact of project and work package due dates on cost and budget performance. Post-optimality analysis information available in most mathematical programming software packages can be used to fine tune both bids and operational schedules. We provide several illustrative examples of the modeling approach and conclude with suggestions for future research.
引用
收藏
页码:169 / 182
页数:14
相关论文
共 13 条
[1]  
ARCHIBALD RD, 1987, PROJECT MANAGEMENT J, V17, P29
[2]  
BAUMGARTNER JS, 1974, DEFENSE MGMT J, V10, P32
[3]  
BLOCK EB, 1971, HARVARD BUS REV, V19, P110
[4]  
DECKRO RF, 1989, OCT ORSA TIMS M
[5]  
DECKRO RF, 1989, OMEGA, V17, P106
[6]  
DECKRO RF, 1989, MAY CORS TIMS ORSA M
[7]  
DECKRO RF, 1987, 16TH P ANN W DSI M, P134
[8]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR
[9]  
Kerzner H., 1979, PROJECT MANAGEMENT S
[10]   EFFECTIVE PLANNING AND CONTROL OF LARGE PROJECTS - USING WORK BREAKDOWN STRUCTURE [J].
LANFORD, HW ;
MCCANN, TM .
LONG RANGE PLANNING, 1983, 16 (02) :38-50