RESERVOIR MANAGEMENT - A RELIABILITY PROGRAMMING APPROACH

被引:19
作者
MARINO, MA [1 ]
MOHAMMADI, B [1 ]
机构
[1] BB&B ASSOCIATES,WESTLAKE VILLAGE,CA 91362
关键词
D O I
10.1029/WR019i003p00613
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:613 / 620
页数:8
相关论文
共 20 条
[1]  
Abramowitz M., 1970, HDB MATH FNCTIONS
[2]   CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING AND OPTIMIZATION OF WATER-RESOURCE SYSTEMS [J].
ASKEW, AJ .
WATER RESOURCES RESEARCH, 1974, 10 (06) :1099-1106
[3]   OPTIMIZATION OF REAL-TIME OPERATION OF A MULTIPLE-RESERVOIR SYSTEM [J].
BECKER, L ;
YEH, WWG .
WATER RESOURCES RESEARCH, 1974, 10 (06) :1107-1112
[4]   RESERVOIR MANAGEMENT VIA RELIABILITY PROGRAMMING [J].
COLORNI, A ;
FRONZA, G .
WATER RESOURCES RESEARCH, 1976, 12 (01) :85-88
[5]  
EASTMAN J, 1973, WATER RESOUR RES, V9, P29, DOI 10.1029/WR009i001p00029
[6]   LINEAR DECISION RULE IN RESERVOIR MANAGEMENT AND DESIGN .5. GENERAL ALGORITHM [J].
GUNDELACH, J ;
REVELLE, C .
WATER RESOURCES RESEARCH, 1975, 11 (02) :204-207
[7]  
HALL WA, 1969, CONTRIB U CALIF WATE, V130
[8]  
HINKS RW, 1977, THESIS PRINCETON U P
[9]   LINEAR DECISION RULE IN RESERVOIR DESIGN AND MANAGEMENT .6. INCORPORATION OF ECONOMIC-EFFICIENCY BENEFITS AND HYDROELECTRIC ENERGY GENERATION [J].
HOUCK, MH ;
COHON, JL ;
REVELLE, CS .
WATER RESOURCES RESEARCH, 1980, 16 (01) :196-200
[10]   CHANCE CONSTRAINED OPTIMIZATION MODEL FOR RESERVOIR DESIGN AND OPERATION [J].
HOUCK, MH .
WATER RESOURCES RESEARCH, 1979, 15 (05) :1011-1016