共 17 条
[1]
MODELS FOR DETERMINING LEAST-COST INVESTMENTS IN ELECTRICITY SUPPLY
[J].
BELL JOURNAL OF ECONOMICS AND MANAGEMENT SCIENCE,
1972, 3 (01)
:267-299
[2]
Baleriaux H., 1967, REVUE, V5, P3
[3]
COMBINED COSTS METHOD FOR OPTIMAL ECONOMIC-PLANNING OF AN ELECTRICAL POWER-SYSTEM
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1975, 94 (06)
:1935-1942
[4]
BESSIERE F, 1970, MANAGEMENT SCI DEC, pB192
[5]
BLOOM JA, 1978, MIT154 OP RES CTR DE
[6]
POWER-SYSTEM SIMULATION MODEL BASED ON PROBABILITY ANALYSIS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1972, PA91 (01)
:62-&
[7]
FINGER S, 1977, ELECTRIC UTILITY SYS
[8]
FINGER S, 1975, MITEL75009WP EN LAB
[9]
Geoffrion A. M., 1972, Journal of Optimization Theory and Applications, V10, P237, DOI 10.1007/BF00934810
[10]
MASSE P, 1957, MANAGE SCI, V3, P149, DOI 10.1287/mnsc.3.2.149