INTEGER PROGRAMMING-MODEL FOR THE GLOBALLY OPTIMAL SCHEDULE OF MULTIPURPOSE BATCH PLANTS

被引:8
作者
FUCHINO, T
MURAKI, M
HAYAKAWA, T
机构
[1] Department of Industrial Engineering and Management, Tokyo Institute of Technology
关键词
SYSTEMS ENGINEERING; SCHEDULING; MULTIPURPOSE BATCH PLANT; INTEGER PROGRAMMING; OPERATION SEQUENCE; EQUIPMENT MODULE SEQUENCE; HOLDING TIME; CLEANUP TIME;
D O I
10.1252/jcej.25.250
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Scheduling becomes important for multipurpose batch plants from the point of their productivity, though it is very complicated since the making of a globally optimal schedule for such a plant requires that the operation sequences in all the equipment modules must be optimized simultaneously with consideration of the holding time and the clean-up time. Furthermore, these sequences interact with each other. In this study, an integer Programing model (IP-model) for the globally optimal schedule of multipurpose batch plants for given equipment module sequences of each product is developed. To formulate this model, the necessary constraints for optimization are considered and the variables to be introduced for describing them are examined. Moreover. these constraints are linearized by introducing integer variables and the sufficient large number for setting the boundaries to their nonlinear terms. The effectiveness of the proposed IP-model is illustrated by solving example scheduling problems.
引用
收藏
页码:250 / 256
页数:7
相关论文
共 8 条
[1]   INCORPORATING SCHEDULING IN THE OPTIMAL-DESIGN OF MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) :141-161
[2]  
EGRI UM, 1986, COMPUT CHEM ENG, V10, P303
[3]  
FUCHINO T, 1991, 4TH PSE 91 INT S PRO, V3, P8
[4]   COMPLETION-TIME ALGORITHMS FOR SERIAL MULTIPRODUCT BATCH PROCESSES WITH SHARED STORAGE [J].
KU, HM ;
KARIMI, I .
COMPUTERS & CHEMICAL ENGINEERING, 1990, 14 (01) :49-69
[5]  
KU HM, 1987, CHEM ENG PROG, V83, P35
[6]   REFORMULATION OF MULTIPERIOD MILP MODELS FOR PLANNING AND SCHEDULING OF CHEMICAL PROCESSES [J].
SAHINIDIS, NV ;
GROSSMANN, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1991, 15 (04) :255-272
[7]  
TSIRUKIS AG, 1991, 4TH PSE 91 INT S PRO, V3, P20
[8]   AN EMBEDDING FORMULATION FOR THE OPTIMAL SCHEDULING AND DESIGN OF MULTIPURPOSE BATCH PLANTS [J].
VASELENAK, JA ;
GROSSMANN, IE ;
WESTERBERG, AW .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1987, 26 (01) :139-148