FLEXIBLE PROCESS PLANS - THEIR VALUE IN FLEXIBLE AUTOMATION SYSTEMS

被引:49
作者
HUTCHINSON, GK
PFLUGHOEFT, KA
机构
[1] School of Business Administration, University of Wisconsin-Milwaukee, Milwaukee, WI, 53201
关键词
D O I
10.1080/00207549408956962
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper defines three classes of process plan flexibility and investigates one class, sequence, via simulation. Sequence flexibility is measured by parallelism and system performance measured by makespan and mean flow time. For a modified job-shop problem both measures had a linear improvement with increased sequence flexibility. When all sequence constraints are removed makespan improved by 33.5% and mean flow time by 26.2%. These benefits were found to decrease as the workload became more continuous and homogeneous. The results have significant implications for mid-volume, mid-variety production from product design and assembly to process design.
引用
收藏
页码:707 / 719
页数:13
相关论文
共 26 条
[1]  
A Lung L., Zhang H., Computer-aided process planning: The state-of-the-art survey, International Journal of Production Research, 27, 4, pp. 553-585, (1989)
[2]  
Ashby W., An Introduction to Cybernetics, (1956)
[3]  
Baker K.R., Introduction to Sequencing and Scheduling, (1974)
[4]  
Beasley J.E., ORJibrary: Distributing test problems by electronic mail, Journal of the Operational Research Society, 41, 11, pp. 1069-1072, (1990)
[5]  
Brill P., Mandelbaum H.M., On measures of flexibility in manufacturing systems, International Journal of Production Research, 27, 5, pp. 747-756, (1989)
[6]  
Catron B., Alps-a language for process specification, International Journal of Computer Integrated Manufacturing, 4, 2, pp. 105-115, (1991)
[7]  
Chang Y., Sullivan R.S., Schedule generation in a dynamic job shop, International Journal of Production Resarch, 28, 1, pp. 65-74, (1990)
[8]  
Conway R.W., Priority dispatching and job lateness in a job-shop, Journal of Industrial Engineering, 16, 4, pp. 228-237, (1965)
[9]  
Daoud Z., Purcheck G., Multi-tool job sequencing for tool-change reduction, International Journal of Production Research, 19, 4, pp. 425-435, (1981)
[10]  
French S., Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop, (1982)