共 20 条
- [1] Production Automation Project Memorandum, 22, (1974)
- [2] Buluncer H.J., Ammer E.D., Computer aided depicting of precedence diagrams-a step towards efficient planning in assembly, Computing and Industrial Engineering, 18, 3-4, pp. 165-169, (1984)
- [3] Dk Fazio T.L., Whitney D.E., Simplified Generation of All Mechanical Assembly Sequences. Ieee Journal of Robotics and Automation, 3, 6, pp. 640-658, (1987)
- [4] De Floriani L., Nagy G., A graph model for face-to-face assembly, Proceedings of the Ieee Internationa! Conference on Robotics and Automation, 1, pp. 75-78, (1989)
- [5] Homem D.F., Mello L.S., Sanderson A.C., Representations of mechanical assembly sequences, IEEE, 7, 2, pp. 211-227, (1991)
- [6] Ikeuchi K., Suehiro T., Tanguy P., Wheeler M., Assembly plan from observation, Annual Research Review, pp. 37-53, (1990)
- [7] Kim S.H., Lee K., An assembly modeling system for dynamic and kinematic analysis, Computer Aided Design, 21, 1, pp. 2-12, (1989)
- [8] Ko H., Lee K., Automatic assembling procedure generation from mating conditions, Computer Aided Design, 19, 1, pp. 3-10, (1987)
- [9] Lee K., Disassembly Planning Based on Subassembly Extraction, Proceedings of the Third Orsa/Nms Conference on Flexible Manufacturing Systems, pp. 383-388, (1989)
- [10] Lee K., Andrews G., Inference of the positions of components in an assembly: Part 2, Computer Aided Design, 17, 1, pp. 20-24, (1985)