共 5 条
[1]
ALTERNATIVE DYNAMIC-PROGRAMMING APPROACHES TO OBTAIN UPPER-BOUNDS FOR THE ECONOMIC LOT SCHEDULING PROBLEM
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1982, 6 (APR)
:17-23
[2]
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[3]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[4]
Elmaghraby S. E., 1978, PRODUCTION IND SYSTE, P649