共 23 条
[1]
Baker K., 1974, INTRO SEQUENCING SCH
[2]
Conway R, 1967, THEORY SCHEDULING
[3]
DELLACROCE F, 1994, DGTC1094 DAI INT REP
[4]
DELLACROCE F, IN PRESS NAVAL RES L
[5]
DELLACROCE F, 1994, DNT0694 DAI INT REP
[6]
DELLACROCE F, 1993, THESIS DAI POLITECNI
[7]
BICRITERION JOBSHOP SCHEDULING WITH TOTAL FLOWTIME AND SUM OF SQUARED LATENESS
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1991, 21 (03)
:295-299
[9]
French S., 1982, SEQUENCING SCHEDULIN