OPTIMAL-DESIGN AND OPERATION OF A BATCH PROCESS WITH INTERMEDIATE STORAGE TANKS

被引:23
作者
TAKAMATSU, T [1 ]
HASHIMOTO, I [1 ]
HASEBE, S [1 ]
机构
[1] KYOTO UNIV,DEPT CHEM ENGN,KYOTO 606,JAPAN
来源
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT | 1982年 / 21卷 / 03期
关键词
D O I
10.1021/i200018a015
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
引用
收藏
页码:431 / 440
页数:10
相关论文
共 5 条
[1]   OPTIMUM DESIGN OF MULTIPURPOSE CHEMICAL-PLANTS [J].
GROSSMANN, IE ;
SARGENT, RWH .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1979, 18 (02) :343-348
[2]  
KETNER SE, 1960, CHEM ENG, V67, P121
[3]   MINIMIZATION OF CAPITAL INVESTMENT FOR BATCH PROCESSES - CALCULATION OF OPTIMUM EQUIPMENT SIZES [J].
LOONKAR, YR ;
ROBINSON, JD .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1970, 9 (04) :625-&
[4]  
ROBINSON JD, 1972, PROCESS TECHNOL INT, V17, P861
[5]   CHOICE OF EQUIPMENT SIZES FOR MULTIPRODUCT BATCH PLANTS - HEURISTICS VS BRANCH AND BOUND [J].
SPARROW, RE ;
FORDER, GJ ;
RIPPIN, DWT .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1975, 14 (03) :197-203