共 16 条
- [1] Covert R. P., 1973, AIIE Transactions, V5, P323, DOI 10.1080/05695557308974918
- [2] ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01): : 50 - 55
- [3] DUERMEYER BL, 1979, OPER RES, V27, P935
- [4] DUERMEYER BL, 1980, NAV RES LOG, V27, P177
- [7] FUJITA S, 1978, AIIE T, V12, P87
- [8] Ghare P.M., 1963, J IND ENG, V14, P238
- [9] HAESSLER RW, 1979, AIIE T, V11, P336, DOI 10.1080/05695557908974480
- [10] MISRA RB, 1975, INT J PROD RES, V13, P445