共 9 条
[1]
Bitran G.R., Chang L., A mathematical programming approach to deterministic kanban system, Management Science, 33, 4, pp. 427-441, (1987)
[2]
Kimura O., Terada H., Design and analysis of pull system: A method of multi-stage production control, International Journal of Production Research, 19, pp. 241-253, (1981)
[3]
Miyazaki S., Ohta H., Nishiyama N., The optimal operating of kanban to minimize the total operation cost, International Journal of Production Research, 26, pp. 1605-1611, (1988)
[4]
Monden Y., What makes the Toyota production system really tick, Industrial Engineering, pp. 36-45, (1981)
[5]
Monden Y., Adaptable kanban system helps Toyota maintainjust-in-time production, Industrial Engineering, 13, pp. 29-51, (1981)
[6]
Monden Y., Smoothed production lets Toyota adapt to demand changes and reduce inventory, Industrial Engineering, pp. 42-51, (1981)
[7]
Monden Y., How Toyota shortened supply lot production time, waiting time and the conveyance time, Industrial Engineering, pp. 22-30, (1981)
[8]
Monden Y., Toyota Production System, (1983)
[9]
Schonberger R., Applications of single-card and dual-card kanban, Interface, 13, 4, pp. 56-67, (1983)