OPERATIONS PLANNING ISSUES IN AN ASSEMBLY DISASSEMBLY ENVIRONMENT

被引:138
作者
BRENNAN, L
GUPTA, SM
TALEB, KN
机构
关键词
ASSEMBLY; OPERATIONS MANAGEMENT; PRODUCTION PLANNING; SCHEDULING;
D O I
10.1108/01443579410066767
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The establishment of disassembly plants and the creation of product designs which specifically facilitate disassembly are enabling manufacturers to carry out item segregation. Item segregation is defined as the separation from an assembly of a part or a group of parts by following a reverse assembly process. Once segregated, the items can be reused, recycled or discarded. However, there are operational problems associated with item segregation. Foremost among these are the lack of planning and scheduling mechanisms, difficulty in coping with reverse flow of materials and item explosion. Despite the economic and environmental benefits of disassembly, researchers and practitioners are lagging behind in developing methodologies to address the operations and production planning and control issues associated with item segregation. These issues are addressed.
引用
收藏
页码:57 / 67
页数:11
相关论文
共 44 条
  • [1] CAD SYSTEM WITH PRODUCT ASSEMBLY DISASSEMBLY PLANNING FUNCTION
    ARAI, E
    IWATA, K
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1993, 10 (1-2) : 41 - 48
  • [2] BABYAK R, 1991, APPLIANCE MANUFACTUR, V39, P68
  • [3] BABYAK RJ, 1991, APPLIANCE MANUFA JUN, V39, P26
  • [4] BAHL HC, 1987, OPERATIONS RES, V35
  • [5] BERRY B, 1992, IRON AGE, V8, P28
  • [6] BOOTHROYD G, 1992, ANN CIRP, V41, P625
  • [7] BROOKE L, 1991, AUTOMOTIVE IND JUN, V171, P57
  • [8] BROOKE L, 1991, AUTOMOT IND, V171, P71
  • [9] BRUENING J, 1991, RECYCLING TODAY NOV, V29, P52
  • [10] GREEN MACHINE
    CORCORAN, E
    [J]. SCIENTIFIC AMERICAN, 1992, 266 (01) : 140 - 141