A MAINTENANCE POLICY FOR REPAIRABLE SYSTEMS BASED ON OPPORTUNISTIC FAILURE-RATE TOLERANCE

被引:62
作者
ZHENG, XT [1 ]
FARD, N [1 ]
机构
[1] NORTHEASTERN UNIV,DEPT IND ENGN & INFORMAT SYST,330 SNELL ENGN CTR,BOSTON,MA 02115
关键词
CORRECTIVE REPLACEMENT; REPAIR; PREVENTIVE REPLACEMENT; HAZARD RATE; OPPORTUNISTIC;
D O I
10.1109/24.87134
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
An opportunistic hazard rate replacement policy for a repairable system with several types of units is presented. A unit is repaired at failure when the hazard rate falls in (0, L-u). A unit is replaced at failure when the hazard rate falls in (L-u, L). An operating unit is replaced when its hazard rate reaches L. When a unit is replaced because its hazard rate reaches L, all operating units with their hazard rates falling in (L-u, L) are replaced. The long-run mean cost rate as a function of L and u is derived. Optimal L and u are obtained to minimize the total maintenance cost rate. Application and analysis of results are demonstrated through a numerical example. The maintenance model is designed for a system with multitype units. Each type has its own increasing hazard rate. Units are repaired or replaced depending on their hazard rate at a failure or active replacement of another unit. The repair interval, replacement limit, and replacement tolerance are determined to yield the optimal total maintenance cost rate.
引用
收藏
页码:237 / 244
页数:8
相关论文
共 11 条
[1]   AN AGE REPLACEMENT POLICY WITH MINIMAL REPAIR COST LIMIT [J].
BAI, DS ;
YUN, WY .
IEEE TRANSACTIONS ON RELIABILITY, 1986, 35 (04) :452-454
[2]  
BARLOW RE, 1975, STATISTICAL THEORY R
[3]   A REPLACEMENT POLICY BASED ON LIMITS FOR THE REPAIR COST RATE [J].
BEICHELT, F .
IEEE TRANSACTIONS ON RELIABILITY, 1982, 31 (04) :401-403
[4]   GENERAL FAILURE MODEL APPLIED TO PREVENTIVE MAINTENANCE POLICIES [J].
BEICHELT, F ;
FISCHER, K .
IEEE TRANSACTIONS ON RELIABILITY, 1980, 29 (01) :39-41
[5]   A GENERALIZED BLOCK-REPLACEMENT POLICY [J].
BEICHELT, F .
IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (02) :171-172
[6]   GENERAL TRIGGER-OFF REPLACEMENT PROCEDURES FOR 2-UNIT SYSTEMS [J].
BERG, M .
NAVAL RESEARCH LOGISTICS, 1978, 25 (01) :15-29
[7]   OPPORTUNISTIC REPLACEMENT IN A DETERMINISTIC ENVIRONMENT [J].
EPSTEIN, S ;
WILAMOWSKY, Y .
COMPUTERS & OPERATIONS RESEARCH, 1985, 12 (03) :311-322
[8]   OPTIMAL GROUP PREVENTIVE MAINTENANCE OF A SYSTEM WITH OBSERVABLE STATE PARAMETER [J].
GERTSBAKH, IB .
ADVANCES IN APPLIED PROBABILITY, 1984, 16 (04) :923-925
[9]   EQUIPMENT RELIABILITY AND MAINTENANCE [J].
JARDINE, AKS ;
BUZACOTT, JA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1985, 19 (03) :285-296
[10]   OPTIMAL AGE REPLACEMENT POLICIES FOR ITEMS FROM A MIXTURE [J].
MURTHY, DNP ;
MAXWELL, MR .
IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (02) :169-170