LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES

被引:259
作者
KARMARKAR, US
机构
[1] Univ of Rochester, Rochester, NY,, USA, Univ of Rochester, Rochester, NY, USA
关键词
D O I
10.1287/mnsc.33.3.409
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
37
引用
收藏
页码:409 / 418
页数:10
相关论文
共 36 条
[1]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[2]  
BAKER KR, 1978, MANAGEMENT SCI, V16, P1710
[3]  
BLACKBURN J, 1976, PRODUCTION INVENTORY
[4]  
Buzacott J. A., 1976, International Journal of Production Research, V14, P597, DOI 10.1080/00207547608956378
[5]   MODELS FOR UNDERSTANDING FLEXIBLE MANUFACTURING SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
AIIE TRANSACTIONS, 1980, 12 (04) :339-350
[6]  
DOBSON G, 1984, QM8419 U ROCH GRAD S
[7]  
FABENS AJ, 1961, J ROY STAT SOC B, V23, P113
[8]   DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS [J].
FLORIAN, M ;
KLEIN, M .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01) :12-20
[9]   PRODUCTION-INVENTORY SYSTEMS WITH A STOCHASTIC PRODUCTION-RATE UNDER A CONTINUOUS REVIEW POLICY [J].
GAVISH, B ;
GRAVES, SC .
COMPUTERS & OPERATIONS RESEARCH, 1981, 8 (03) :169-183
[10]   A ONE-PRODUCT PRODUCTION-INVENTORY PROBLEM UNDER CONTINUOUS REVIEW POLICY [J].
GAVISH, B ;
GRAVES, SC .
OPERATIONS RESEARCH, 1980, 28 (05) :1228-1236