SOLUTIONS TO CONSTRAINED FLOWSHOP SEQUENCING PROBLEM

被引:78
作者
BONNEY, MC [1 ]
GUNDRY, SW [1 ]
机构
[1] UNIV NOTTINGHAM,DEPT PROD ENGN & PROD MANAGEMENT,NOTTINGHAM NG7 2RD,ENGLAND
关键词
D O I
10.2307/3009170
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:869 / 883
页数:15
相关论文
共 11 条
[1]  
BAKSHI MS, 1969, MANAGE SCI B-APPL, V16, pB247
[2]  
GUNDRY SW, 1972, THESIS U NOTTINGHAM
[3]  
Gupta J.N., 1968, INT J PROD RES, V7, P241
[4]   FUNCTIONAL HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
OPERATIONAL RESEARCH QUARTERLY, 1971, 22 (01) :39-&
[5]  
JOHNSON SM, 1954, NAV RES LOGIST Q, V1, P66
[7]  
PAGE ES, 1961, J ROY STAT SOC B, V23, P484
[8]  
PAJAK ZT, 1971, 1971 CURR PROD SCHED
[10]  
VITHANI C, 1974, THESIS U NOTTINGHAM