SCHEDULING IN SERIAL MULTIPRODUCT BATCH PROCESSES WITH FINITE INTERSTAGE STORAGE - A MIXED INTEGER LINEAR PROGRAM FORMULATION

被引:65
作者
KU, HM [1 ]
KARIMI, IA [1 ]
机构
[1] NORTHWESTERN UNIV,DEPT CHEM ENGN,EVANSTON,IL 60208
关键词
D O I
10.1021/ie00082a017
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
引用
收藏
页码:1840 / 1848
页数:9
相关论文
共 10 条
[1]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[2]   SEQUENCING 2-MACHINE FLOW-SHOPS WITH FINITE INTERMEDIATE STORAGE [J].
DUTTA, SK ;
CUNNINGHAM, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (09) :989-996
[3]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[4]  
Johnson SM, 1954, NAV RES LOGIST Q, V1, P61, DOI DOI 10.1002/NAV.3800010110
[5]  
KU HM, 1987, CHEM ENG PROG AUG, P1
[6]   FLOWSHOP SCHEDULING WITH LIMITED TEMPORARY-STORAGE [J].
PAPADIMITRIOU, CH ;
KANELLAKIS, PC .
JOURNAL OF THE ACM, 1980, 27 (03) :533-549
[7]  
Reklaitis G, 1982, AICHE S SER, V78, P119
[8]  
WIEDE W, 1984, DETERMINATION COMP 3
[9]  
WIEDE W, 1984, DETERMINATION COMP 1
[10]  
WIEDE W, 1984, DETERMINATION COMP 2