NETWORK APPROACH TO A MULTI-FACILITY, MULTI-PRODUCT PRODUCTION SCHEDULING PROBLEM WITHOUT BACKORDERING

被引:12
作者
DORSEY, RC
HODGSON, TJ
RATLIFF, HD
机构
[1] TENNESSEE EASTMAN CO,KINGSPORT,TN 37600
[2] UNIV FLORIDA,GAINESVILLE,FL
来源
MANAGEMENT SCIENCE SERIES A-THEORY | 1975年 / 21卷 / 07期
关键词
D O I
10.1287/mnsc.21.7.813
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:813 / 822
页数:10
相关论文
共 17 条
[1]  
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[2]  
DOOLEY JE, 1969, CANADIAN OPERATIONS, V7, P165
[3]  
ELMAGHRABY S, 1972, OR76 N CAR STAT U RE
[4]  
ELMAGHRABY S, 1970, AIIE T, V2, P203
[5]  
ELMAGHRABY SE, 1968, NAV RES LOGIST Q, V15, P205
[6]  
Ford Lester R., 1962, FLOWS NETWORKS
[7]   AN OUT-OF-KILTER METHOD FOR MINIMAL-COST FLOW PROBLEMS [J].
FULKERSON, DR .
JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1961, 9 (01) :18-27
[8]  
HADLEY G, 1963, ANALYSIS INVENTORY S
[9]  
HAESSLER RW, 1971, MANAGE SCI B-APPL, V18, pB240
[10]   ADDENDUM TO STANKARD AND GUPTAS NOTE ON LOT SIZE SCHEDULING [J].
HODGSON, TJ .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (07) :514-517