HEURISTICS FOR SCHEDULING RESOURCE CONSTRAINED PROJECTS - EXPERIMENTAL INVESTIGATION

被引:106
作者
COOPER, DF [1 ]
机构
[1] UNIV LONDON ROY HOLLOWAY COLL,LONDON,ENGLAND
关键词
D O I
10.1287/mnsc.22.11.1186
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1186 / 1194
页数:9
相关论文
共 15 条
[1]  
Arcus AL, 1965, INT J PROD RES, P259
[2]  
BENNINGTON GE, 1972, 81 N CAR STAT U OP R
[3]  
Berge C., 1962, THEORY GRAPHS ITS AP
[4]  
Ciobanu Gh., 1971, Economic Computation and Economic Cybernetics Studies and Research, P81
[5]  
COOPER DF, 1974, 6TH P AUSTR COMP C S
[6]  
COOPER DF, 1974, THESIS U ADELAIDE
[7]  
DAVIES EM, 1972, OPERATIONAL RES Q, V24, P587
[8]  
Davis E. W., 1973, AIIE T, V5, P297
[9]   ALGORITHMS FOR SOLVING PRODUCTION-SCHEDULING PROBLEMS [J].
GIFFLER, B ;
THOMPSON, GL .
OPERATIONS RESEARCH, 1960, 8 (04) :487-503
[10]  
KARNI R, 1973, MGMT INFORMATICS, V2, P57