SAMPLE-SIZE REDUCTION IN STOCHASTIC PRODUCTION SIMULATION

被引:15
作者
BREIPOHL, A
LEE, FN
HUANG, J
FENG, Q
机构
[1] School of Electrical Engineering and Computer Science, The University of Oklahoma, Norman, OK
关键词
Monte Carlo Production Simulation; Probabilistic Production Simulation; Variance;
D O I
10.1109/59.65930
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a method of Monte Carlo production simulation that combines the use of a control variable with stratified sampling. The method reduces the number of required runs from approximately 10, 000 to 10. This reduction in the required number of runs and hence computational time should enable chronological simulation to play a much more significant role in many long—range planning applications. Both the theory and a sample Study are presented in the paper. © 1990 IEEE
引用
收藏
页码:984 / 992
页数:9
相关论文
共 18 条
[1]  
BABB RA, POWRSYM PRODUCTION C
[2]  
BALERIAUX H, 1967, REVU E, V5, P7
[3]   POWER-SYSTEM SIMULATION MODEL BASED ON PROBABILITY ANALYSIS [J].
BOOTH, RR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (01) :62-&
[4]  
COHEN AI, 1987, DEC P IEEE, V75, P1574
[5]   THE MIXTURE OF NORMALS APPROXIMATION TECHNIQUE FOR EQUIVALENT LOAD DURATION CURVES [J].
GROSS, G ;
GARAPIC, NV ;
MCNUTT, B .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (02) :368-374
[6]   SHORT-TERM THERMAL UNIT COMMITMENT - A NEW METHOD [J].
LEE, FN .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (02) :421-428
[7]   A FUEL-CONSTRAINED UNIT COMMITMENT METHOD [J].
LEE, FN .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1208-1218
[8]  
LIN M, 1989 IEEE PES WINT M
[9]  
MANHIRE B, 1982, AUG P C GEN PLANN MO
[10]  
MARNAY C, 1990, VARIANCE REDUCTION M