SINGLE-STAGE AND SERIAL PRODUCTION LINE SYSTEMS WITH UNRELIABLE MACHINES AND GENERAL PROBABILITY-DISTRIBUTIONS

被引:4
作者
KOULAMAS, CP
机构
[1] Department of Decision Sciences and Information Systems, Florida International University, Miami, Florida
关键词
D O I
10.1111/j.1540-5915.1993.tb00478.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents stochastic models for analyzing production to stock and production on demand systems with arbitrary demand, production, machine breakdown and repair processes and a finite buffer. Expressions are developed for the transition probabilities among the different states, the proportion of transitions that take the process to a particular state, the probabilities that the process is at a particular state, and the expected state residence times. Alw, expressions are developed for some quantities of interest, like average inventory, percentage of lost sales, and expected waiting time. Applications are discussed for various demand, production, machine breakdown, and repair processes and numerical examples ate presented. Guidelines are given for utilizing the models in evaluating the economic performance of production systems. Using an approximation procedure, the models are used for modeling multi-stage serial production to stock and production on demand lines. Simulation results indicated that the quality of the approximation is very good. The multi-stage models are useful in practical situations, because they allow the use of different probability distributions for the various processes (production, machine failure, etc.) of each stage.
引用
收藏
页码:343 / 369
页数:27
相关论文
共 21 条
[2]  
ALTIOK TM, 1982, IIE TRANS, V14, P125
[3]   THE PERFORMANCE OF PUSH AND PULL SYSTEMS - A CORRECTED ANALYSIS [J].
BAKER, KR ;
POWELL, SG ;
PYKE, DF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (09) :1731-1736
[4]   MODELS FOR UNDERSTANDING FLEXIBLE MANUFACTURING SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
AIIE TRANSACTIONS, 1980, 12 (04) :339-350
[5]   MODELS OF AUTOMATIC TRANSFER LINES WITH INVENTORY BANKS - REVIEW AND COMPARISON [J].
BUZACOTT, JA ;
HANIFIN, LE .
AIIE TRANSACTIONS, 1978, 10 (02) :197-207
[6]   KANBAN CONTROLLED PULL SYSTEMS - AN ANALYTIC APPROACH [J].
DELEERSNYDER, JL ;
HODGSON, TJ ;
MULLER, H ;
OGRADY, PJ .
MANAGEMENT SCIENCE, 1989, 35 (09) :1079-1091
[7]   OPTIMAL MAINTENANCE POLICIES FOR SINGLE-SERVER QUEUING-SYSTEMS SUBJECT TO BREAKDOWNS [J].
FEDERGRUEN, A ;
SO, KC .
OPERATIONS RESEARCH, 1990, 38 (02) :330-343
[8]   MARKOVIAN MODELS FOR INVESTIGATING FAILURE AND REPAIR CHARACTERISTICS OF PRODUCTION SYSTEMS [J].
FOSTER, JW ;
GARCIADIAZ, A .
IIE TRANSACTIONS, 1983, 15 (03) :202-209
[9]   AN EFFICIENT DECOMPOSITION METHOD FOR THE APPROXIMATE EVALUATION OF TANDEM QUEUES WITH FINITE STORAGE SPACE AND BLOCKING [J].
GERSHWIN, SB .
OPERATIONS RESEARCH, 1987, 35 (02) :291-305
[10]  
GRESHWIN SB, 1983, OPER RES, V31, P354