A FRAMEWORK FOR MODELING SETUP CARRYOVER IN THE CAPACITATED LOT-SIZING PROBLEM

被引:40
作者
GOPALAKRISHNAN, M
MILLER, DM
SCHMIDT, CP
机构
[1] Department of Decision Sciences and MIS, Concordia University, Montreal, H3G1M8
[2] Department of Management Science andStatistics, University of Alabama, Tuscaloosa, AL
关键词
D O I
10.1080/00207549508904793
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the single-level capacitated lot sizing problem (CLSP) with setup carryover. Specifically, we consider a class of production planning problems in which multiple products can be produced within a time period and significant setup times are incurred when changing from one product to another. Hence, there might be instances where developing a feasible schedule becomes possible only if setups are carried over from one period to another. We develop a modelling framework to formulate the CLSP with setup times and setup carryovers. We then extend the modelling framework to include multiple machines and tool requirements planning. The need for such a model that integrates both planning and lot sizing decisions is motivated by the existence of a similar problem in a paper mill. We apply the modelling framework to solve optimally, an instance of the paper mill's problem.
引用
收藏
页码:1973 / 1988
页数:16
相关论文
共 17 条
[1]  
Aras O.A., Swanson L.A., A lot sizing and sequencing algorithm for dynamic demands upon a single facility, Journal of Operations Management, 2, pp. 177-185, (1982)
[2]  
Bami H.C., Ritzman L.P., Gupta J., Determining lot sizes and resource requirements: A review, Operations Research, 35, pp. 329-345, (1987)
[3]  
Cattryssf D., Salomon M., Kijik R., Van Wassenhove L.N., A dual ascent and column generation heuristic for the discrete lot sizing and scheduling problem with setup times, Management Science, 39, pp. 477-486, (1993)
[4]  
Dixon P.S., Silver E.A., A heuristic solution procedure for the multi-item, single-level, limited capacity lot-sr/ing problem, Journal of Operations Management, 2, pp. 23-39, (1981)
[5]  
Dzieunski B.P., Gomory R.E., Optimal Programming of Lot Sizes, Inventory and Labor Allocations, pp. 874-890, (1965)
[6]  
Eisknilrr P.S., A dynamic lot sizing algorithm with capacity constraints. A/IF, Transactions, 7, pp. 170-176, (1975)
[7]  
Gisspy C.R., Minimum change-over scheduling of several products on one machine, Operations Research, 16, pp. 343-352, (1968)
[8]  
Gascon A., Leachman R.C., A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem, Operations Research, 36, pp. 50-56, (1988)
[9]  
Lambrecht M.R., Vandkrveken H., Heuristic procedures for the single operation, multi-item loading problem, AUE Transactions, 11, pp. 319-326, (1979)
[10]  
Lasdon L.S., Terjuno R.C., An efficient algorithm for multi-item scheduling, Operations Research, 19, pp. 946-969, (1971)