IMPROVING THROUGH-FLIGHT SCHEDULES

被引:5
作者
BARD, JF [1 ]
CUNNINGHAM, IG [1 ]
机构
[1] ISTEL INC, DALLAS, TX 75240 USA
关键词
D O I
10.1080/07408178708975393
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:242 / 251
页数:10
相关论文
共 18 条
[1]   EFFICIENT HEURISTIC SOLUTIONS TO AN AIRLINE CREW SCHEDULING PROBLEM [J].
BAKER, EK ;
BODIN, LD ;
FINNEGAN, WF ;
PONDER, RJ .
AIIE TRANSACTIONS, 1979, 11 (02) :79-85
[2]   WORKFORCE SCHEDULING WITH CYCLIC DEMANDS AND DAY-OFF CONSTRAINTS [J].
BAKER, KR ;
MAGAZINE, MJ .
MANAGEMENT SCIENCE, 1977, 24 (02) :161-167
[3]  
BODIN L, 1983, COMPUT OPER RES, V10, P63, DOI 10.1016/0305-0548(83)90030-8
[4]  
BRACKEN J, 1975, OPER RES, V5, P979
[5]  
Cook T. M., 1978, Decision Sciences, V9, P673, DOI 10.1111/j.1540-5915.1978.tb00753.x
[6]  
COOK TM, 1983, PRELIMINARY ESTIMATE
[7]   AIRLINE SCHEDULING - AN OVERVIEW [J].
ETSCHMAIER, MM ;
MATHAISEL, DFX .
TRANSPORTATION SCIENCE, 1985, 19 (02) :127-138
[8]   HEURISTIC ALGORITHM FOR VEHICLE-DISPATCH PROBLEM [J].
GILLETT, BE ;
MILLER, LR .
OPERATIONS RESEARCH, 1974, 22 (02) :340-349
[9]   THE PASSENGER-MIX PROBLEM IN THE SCHEDULED AIRLINES [J].
GLOVER, F ;
GLOVER, R ;
LORENZO, J ;
MCMILLAN, C .
INTERFACES, 1982, 12 (03) :73-80
[10]   FRAMEWORK FOR PROBABILISTIC VEHICLE ROUTING [J].
GOLDEN, BL ;
YEE, JR .
AIIE TRANSACTIONS, 1979, 11 (02) :109-112