SIMULATION-MODEL TO FORECAST PROJECT COMPLETION-TIME

被引:62
作者
AHUJA, HN
NANDAKUMAR, V
机构
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1985年 / 111卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1985)111:4(325)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:325 / 342
页数:18
相关论文
共 12 条
[1]  
Ahuja HN., 2014, PROJECT MANAGEMENT T
[2]  
AHUJA HN, 1984, JUN T AM ASS COST EN
[3]  
Ayyub BM, 1983, THESIS GEORGIA I TEC
[4]  
BALDWIN JR, 1971, ASCE J CONSTRUCTION, V97
[5]  
BORCHERDING JD, 1980, 24TH T AM ASS COST E, V1
[6]  
CARR RI, 1979, ASCE J CONSTRUCTION, V105
[7]  
GATES M, 1972, ASCE J CONSTRUCTION, V98
[8]  
HALPIN DW, 1970, CONSTRUCTO COMPUTERI
[9]  
LORENZONI AB, 1979, COST ENG, V21, P189
[10]  
OBRIEN, CPM CONSTRUCTION MAN