REAL-TIME PRODUCTION CONTROL OF AN FMS IN A PRODUCE-TO-ORDER ENVIRONMENT

被引:18
作者
ARZI, Y
ROLL, Y
机构
[1] Department of Industrial Engineering, Tel-Aviv University, Tel-Aviv
[2] Technion—Israel Institute of Technology, Haifa
关键词
D O I
10.1080/00207549308956853
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with real-time control of an FMS, operating in a produce-to-order environment, with machines subject to failure. A two-level production control system (PCS) is developed and examined. The proposed PCS incorporates three principles: no need for pre-planning procedures; separation between due-date and operational considerations; and full exploitation of process flexibility. In an extensive series of simulation experiments it was demonstrated that the proposed PCS leads to good results in both criteria: maximum throughput and minimum tardiness of orders. A comparison study between this PCS and one which is not based on separation between due-date and operational considerations, indicated the advantage of the former.
引用
收藏
页码:2195 / 2214
页数:20
相关论文
共 24 条
[1]  
Arzi Y., Scheduling Regimes in a Flexible Manufacturing Cell within a Hierarchical Control System, (1990)
[2]  
Avonts L.H., Gelders L.F., Van Wassenhove L.N., Allocating work between an FMS and a Conventional jobshop: A case study, European Journal of Operational Research, 33, pp. 245-256, (1988)
[3]  
Browne J., Dubois D., Rathmill K., Sethi S.P., Stecke K.E., Classification of flexible manufacturing systems, The FMS Magazine, pp. 114-117, (1984)
[4]  
Chang Y.L., Sullivan R.S., Bagchi U., Wilson J.R., Experimental investigation of real-time scheduling in flexible manufacturing systems, Annals of Operations Research, 3, pp. 355-377, (1985)
[5]  
Davis W.J., Jones A.T., A real time production scheduler for a stochastic manufacturing environment, International Journal of Computer-Integrated Manufacturing, 11, 2, pp. 101-112, (1988)
[6]  
Denzler D.R., Boe W.J., Experimental investigation of flexible manufacturing system scheduling decision rules, International Journal of Production Research, 25, 7, pp. 979-994, (1987)
[7]  
Gareth M., Pozzetti A., Bareggi A., On-line loading and dispatching in flexible manufacturing system, International Journal of Production Research, 28, 7, pp. 1271-1292, (1990)
[8]  
Man M.-H., McGinnis L.F., Flow control in flexible manufacturing: Minimization of stockout cost, International Journal of Production Research, 27, 4, pp. 701-715, (1989)
[9]  
Hildebrant R.R., Scheduling flexible machining systems using mean value analysis, Proceedings of the 19Th Ieee Conference on Decision and Control, pp. 701-706, (1980)
[10]  
Hutchison J., Leong K., Snyder D., Ward P., Scheduling approaches for random job shop flexible manufacturing systems, International Journal of Production Research, 29, 5, pp. 1053-1067, (1991)