COST OPTIMIZATION OF PERIODIC PREVENTIVE MAINTENANCE

被引:118
作者
CANFIELD, RV
机构
关键词
D O I
10.1109/TR.1986.4335355
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:78 / 81
页数:4
相关论文
共 14 条
[1]  
ABRAMOWITZ, 1964, NBS APPLIED MATH SER, V55, P1046
[2]   GENERALIZED PREVENTIVE MAINTENANCE POLICIES FOR A SYSTEM SUBJECT TO DETERIORATION [J].
BAI, DS ;
JANG, JS ;
KWON, YI .
IEEE TRANSACTIONS ON RELIABILITY, 1983, 32 (05) :512-514
[3]   A GRAPHICAL-METHOD APPLICABLE TO AGE-REPLACEMENT PROBLEMS [J].
BERGMAN, B ;
KLEFSJO, B .
IEEE TRANSACTIONS ON RELIABILITY, 1982, 31 (05) :478-481
[4]  
CHRISTER AH, 1984, DEV OPERATIONAL RES, P31
[5]  
KAHN NM, 1983, IEEE T RELIABILITY, V32, P396
[6]  
KAPUR PK, 1980, IEEE T RELIABILITY, V29, P297
[7]  
MINE H, 1981, IEEE T RELIAB, V30, P391, DOI 10.1109/TR.1981.5221132
[8]   OPTIMAL AGE REPLACEMENT POLICIES FOR ITEMS FROM A MIXTURE [J].
MURTHY, DNP ;
MAXWELL, MR .
IEEE TRANSACTIONS ON RELIABILITY, 1981, 30 (02) :169-170
[9]   OPTIMAL NUMBER OF FAILURES BEFORE REPLACEMENT TIME [J].
NAKAGAWA, T .
IEEE TRANSACTIONS ON RELIABILITY, 1983, 32 (01) :115-116
[10]   IMPERFECT PREVENTIVE-MAINTENANCE [J].
NAKAGAWA, T .
IEEE TRANSACTIONS ON RELIABILITY, 1979, 28 (05) :402-402