SCHEDULING PARALLEL PRODUCTION LINES WITH CHANGEOVER COSTS - PRACTICAL APPLICATION OF A QUADRATIC ASSIGNMENT-LP APPROACH

被引:81
作者
GEOFFRION, AM [1 ]
GRAVES, GW [1 ]
机构
[1] UNIV CALIF LOS ANGELES,LOS ANGELES,CA 90024
关键词
D O I
10.1287/opre.24.4.595
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:595 / 610
页数:16
相关论文
共 10 条
[1]  
BALAS E, 1973, MAY SPRING C GRAPH C
[2]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[3]   BALANCING WORKLOADS AND MINIMIZING SET-UP COSTS IN PARALLEL PROCESSING SHOP [J].
DEANE, RH ;
WHITE, ER .
OPERATIONAL RESEARCH QUARTERLY, 1975, 26 (01) :45-53
[4]  
ELMAGHRABY SE, 1974, OR97 N CAR STAT U PR
[5]   INTEGER PROGRAMMING ALGORITHMS - FRAMEWORK AND STATE-OF-ART SURVEY [J].
GEOFFRION, AM ;
MARSTEN, RE .
MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (09) :465-491
[6]  
GRAVES GW, 1970, MANAGE SCI, V17, P453
[7]   PRODUCTION SCHEDULING PROBLEM WITH SEQUENCING CONSIDERATIONS [J].
PRABHAKAR, T .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 21 (01) :34-42
[8]  
PRABHAKAR T, 1973, S THEORY SCHEDULING
[9]  
RADKE MA, 1975, THESIS UCLA
[10]  
WILLIAMS A, 1973, 8 INT S MATH PROGR S