NEW TECHNOLOGY INVESTMENTS IN MULTISTAGE PRODUCTION SYSTEMS

被引:12
作者
CHAKRAVARTY, AK [1 ]
SHTUB, A [1 ]
机构
[1] TEL AVIV UNIV,DEPT IND ENGN,IL-69978 TEL AVIV,ISRAEL
关键词
D O I
10.1111/j.1540-5915.1985.tb01678.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:248 / 264
页数:17
相关论文
共 16 条
[1]  
ARAI J, 1981, PRODUCTION INVENTORY, V1, P26
[2]   ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, M ;
WILLIAMS, JF .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :517-527
[3]  
GILBERT RJ, 1981, AM ECON REV, V71, P172
[4]  
GOYAL SK, 1973, OPERATIONS RES Q, V3, P261
[5]  
Manne A. S., 1967, INVESTMENTS CAPACITY
[6]  
MASSE P, 1962, OPTIMAL INVESTMENT D
[7]  
MONDEN Y, 1981, IND ENG SEP, P22
[8]  
Monden Y., 1983, TOYOTA PRODUCTION SY
[9]  
SCHONBERGER RICHARD J., 1982, JAPANESE MANUFACTURI
[10]   OPTIMAL AND SYSTEM MYOPIC POLICIES FOR MULTI-ECHELON PRODUCTION-INVENTORY ASSEMBLY SYSTEMS [J].
SCHWARZ, LB ;
SCHRAGE, L .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (11) :1285-1294