共 12 条
[1]
Akella R., Kumar P.R., Optimal control of production rate in a failure prone manufacturing system. IEEE Transactions on Automatic Control, AC-31, pp. 116-126, (1986)
[2]
Akella R., Choong Y., Gershwin S.B., Performance of hierarchical production scheduling policy. I, EEE Transaction on Components, Hybrids, and Manufacturing Technology, 7, 3, pp. 225-248, (1984)
[3]
Biblecki T., Kumar P.R., Optimality of zero-inventory policies for unreliable manufacturing systems, Operations Research, 36, pp. 532-541, (1988)
[4]
Gershwin S.B., Akella R., Choong Y., Short term scheduling of an automated manufacturing facility, IBM Journal of Research and Development, 29, pp. 392-400, (1985)
[5]
Gershwin S.B., Hierarchical flow control: A framework for scheduling and planning discrete events in manufacturing systems, Proceedings of the IEEE, 77, pp. 195-209, (1989)
[6]
Kimemia J.G., Hierarchical control of production in flexible manufacturing systems. Massachusetts Institute of Technology, Laboratory for Information and Decision Systems, (1982)
[7]
Kimemia J.G., Gershwin S.B., An algorithm for the computer control of production in flexible manufacturing systems, IIE Transactions, 15, pp. 353-362, (1983)
[8]
Maimon O., Gershwin S.B., Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines, Operations Research, 36, pp. 279-292, (1988)
[9]
Porteus E.L., Bounds and transformations for discounted finite Markov decision chains, Operations Research, 33, pp. 761-784, (1975)
[10]
Ross S.M., Applied Probability Models with Optimization Application, (1970)