ECONOMIC-MODELS FOR R-AND-D PROJECT SELECTION IN THE PRESENCE OF PROJECT INTERACTIONS

被引:95
作者
FOX, GE [1 ]
BAKER, NR [1 ]
BRYANT, JL [1 ]
机构
[1] UNIV CINCINNATI,COLL BUSINESS ADM,DEPT QUANTITAT ANAL,CINCINNATI,OH 45221
关键词
MATHEMATICAL PROGRAMMING;
D O I
10.1287/mnsc.30.7.890
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A modeling framework is proposed within which certain kinds of benefit interactions, called present value (PV) interactions, are assessed indirectly by explicitly modeling R and D project impacts on profitability. Within the proposed framework, the role of traditionally recognized types of interaction in the calculation of present value is clarified, and it is shown that PV interaction exists even when traditionally recognized types of interaction are assumed to be absent. The proposed framework offers one method for assessing PV interactions. An example illustrates the framework and shows that ignoring PV interactions can result in both nonoptimal project selections and resource allocations, even when traditionally recognized types of interactions are absent.
引用
收藏
页码:890 / 902
页数:13
相关论文
共 26 条
[1]  
AAKER RD, 1978, IEEE T ENG MANAG, V25, P30
[2]   RECENT ADVANCES IN R AND D BENEFIT MEASUREMENT AND PROJECT SELECTION METHODS [J].
BAKER, N ;
FREELAND, J .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (10) :1164-1175
[3]  
Baker N. R., 1964, IEEE T ENG MANAGEMEN, V11
[4]  
BAKER NR, 1978, RES POLICY, V7
[5]   RISK EVALUATION OF INVESTMENT PROJECTS [J].
BONINI, CP .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1975, 3 (06) :735-750
[6]  
CHAVEZ MM, 1983, FACING CHALLENGE 198
[7]  
COCHRAN MA, 1971, IEEE T ENG MANAGEMEN, V18
[8]   ADVANCED MATERIEL SYSTEMS PLANNING [J].
DEAN, BV ;
HAUSER, LE .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1967, EM14 (01) :21-&
[9]   SCORING AND PROFITABILITY MODELS FOR EVALUATING AND SELECTING ENGINEERING PROJECTS [J].
DEAN, BV ;
NISHRY, MJ .
OPERATIONS RESEARCH, 1965, 13 (04) :550-&
[10]  
FOX GE, 1980, THESIS U CINCINNATI