FLOWSHOP PROBLEMS WITH TIME LAGS

被引:17
作者
SZWARC, W
机构
关键词
D O I
10.1287/mnsc.29.4.477
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
11
引用
收藏
页码:477 / 481
页数:5
相关论文
共 11 条
[1]  
Johnson S. M., 1954, NAV RES LOGIST Q, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[2]   SEQUENCING N-JOBS ON 2 MACHINES WITH ARBITRARY TIME LAGS - DISCUSSION [J].
JOHNSON, SM .
MANAGEMENT SCIENCE, 1959, 5 (03) :299-303
[3]  
MAGGU PL, 1980, PURE APPL MATH SCI, V12
[4]   SEQUENCING N-JOBS ON 2 MACHINES WITH ARBITRARY TIME LAGS [J].
MITTEN, LG .
MANAGEMENT SCIENCE, 1959, 5 (03) :293-298
[5]  
MITTEN LG, 1959, J IND ENG, V10, P131
[6]  
NABESHIMA I, 1963, J OPER RES SOC JPN, V5, P97
[7]  
SULE DR, UNPUB NAVAL RES LOGI
[8]   SPECIAL CASES OF FLOW-SHOP PROBLEM [J].
SZWARC, W .
NAVAL RESEARCH LOGISTICS, 1977, 24 (03) :483-492
[9]  
SZWARC W, 1968, NAV RES LOGIST Q, V15, P127
[10]  
SZWARC W, 1974, NAVAL RES LOGIST Q, V21, P141