SET-UP COSTS AND THEORY OF EXHAUSTIBLE RESOURCES

被引:29
作者
HARTWICK, JM
KEMP, MC
VANLONG, N
机构
[1] UNIV NEW S WALES,SCH ECON,KENSINGTON,NSW 2033,AUSTRALIA
[2] AUSTRALIAN NATL UNIV,DEPT ECON,CANBERRA,ACT 2600,AUSTRALIA
关键词
ECONOMICS - Mathematical Models - ENVIRONMENTAL ENGINEERING - ORE DEPOSITS - Evaluation;
D O I
10.1016/0095-0696(86)90022-7
中图分类号
F [经济];
学科分类号
02 ;
摘要
The opening of a mine may involve once-and-for-all 'set-up' costs of exploration, clearing, tunneling, training, equipping; and its closure once-and-for-all costs of dismantling and cleaning-up. Indeed such non-recurrent costs may dominate the fixed and variable flow costs of resource extraction. It is puzzling then that in the formal economic analysis of exhaustible resources, attention has been focussed on the latter to the almost complete neglect of the former. It is the purpose in the present note to repair this deficiency and, in particular, to set forth a generalized form of Hotelling's 'r per cent rule' for the behaviour over time of the expected marginal current net benefit (MNB) derived from extraction. The most important finding is that if set-up costs are present then, along an optimal path, MNB must increase not continuously and exponentially at the current rate of interest but in discontinuous saw-tooth fashion at an average rate less than the rate of interest.
引用
收藏
页码:212 / 224
页数:13
相关论文
共 14 条
[1]  
DASGUPTA P, 1979, UNPUB MARKET STRUCTU
[2]  
ESWARAN M, 1983, J POLIT EC, V91, P145
[3]  
Hadley G, 1971, VARIATIONAL METHODS
[4]   EXPLOITATION OF MANY DEPOSITS OF AN EXHAUSTIBLE RESOURCE [J].
HARTWICK, JM .
ECONOMETRICA, 1978, 46 (01) :201-217
[5]  
Herfindahl OC, 1967, EXTRACTIVE RESOURCES
[6]  
Hestenes MR., 1966, CALCULUS VARIATIONS
[7]   THE ECONOMICS OF EXHAUSTIBLE RESOURCES [J].
Hotelling, Harold .
JOURNAL OF POLITICAL ECONOMY, 1931, 39 (02) :137-175
[8]  
KEMP MC, 1980, HERFINDAHLS PROBLEM
[9]  
KEMP MC, 1976, 3 TOPICS THEORY INT, pCH23
[10]  
KEMP MC, 1980, EXHAUSTIBLE RESOURCE, P55