A PROGRESSIVE APPROACH FOR THE INTEGRATION OF PROCESS PLANNING AND SCHEDULING

被引:53
作者
HUANG, SH
ZHANG, HC
SMITH, ML
机构
[1] Department of Industrial Engineering, Texas Tech University, Lubbock, TX
基金
美国国家科学基金会;
关键词
D O I
10.1080/07408179508936762
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Automated process planning has been recognized as an interface between computer-aided design and computer-aided manufacturing. To achieve true computer integrated manufacturing (CIM), process planning should be integrated with scheduling. One approach to this integration problem is to merge process planning and scheduling into a single optimization task. However, the scheduling problem alone belongs to the class of nondeterministic polynomial complete (NP-complete) problems and when combined with process planning, the resulting problem is even more difficult. One solution to this is to adopt a progressive approach, in which the interaction between process planning and scheduling starts from a more global level and ends at a more detailed level. The progressive approach described in this paper greatly reduces the computational complexity of the integration problem and hence can be realized in a real manufacturing environment where time is critical.
引用
收藏
页码:456 / 464
页数:9
相关论文
共 24 条
[1]   COMPUTER-AIDED PROCESS PLANNING - THE STATE-OF-THE-ART SURVEY [J].
ALTING, L ;
ZHANG, HC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :553-585
[2]  
[Anonymous], 1984, ROBOT CIM-INT MANUF
[3]  
BRASSARD G, 1988, ALGORITHMICS THEORY
[4]  
Chang T. C., 1985, INTRO AUTOMATED PROC
[5]  
Chang T-C, 1990, EXPERT PROCESS PLANN
[6]  
CHEN Q, 1992, PROD PLAN CONTROL, V3, P1
[7]  
CHRYSSOLOURIS G, 1985, ANN CIRP, V34, P413
[8]  
ELMARAGHY HA, 1992, 24TH P CIRP INT SEM, P1
[9]  
HADAVI K, 1991, J MANUF SYST, V9, P332
[10]  
HUANG H, 1993, 1993 P NSF DES MAN S, V2, P1373