PRODUCTION RUNS FOR MULTIPLE PRODUCTS - 2-PRODUCT HEURISTIC

被引:21
作者
SAIPE, AL [1 ]
机构
[1] YORK UNIV,DOWNSVIEW M3J 1P3,ONTARIO,CANADA
关键词
D O I
10.1287/mnsc.23.12.1321
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The optimal solution is presented for the problem of determining production run sizes for two products which must be produced on the same machine. This solution forms the basis for a heuristic solution to the N product problem. This heuristic provides uniformly better results than the complete-cycle heuristic for this problem. Numerical examples are presented to illustrate the method.
引用
收藏
页码:1321 / 1327
页数:7
相关论文
共 19 条
[1]   MADIGANS APPROACH TO DETERMINISTIC MULTI-PRODUCT PRODUCTION AND INVENTORY PROBLEM [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (09) :636-638
[2]  
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[3]  
BROWN RG, 1967, DECISION RULES INVEN, P46
[4]  
Buffa E. S., 1972, PRODUCTION INVENTORY
[5]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[6]  
EILON S, 1962, ELEMENTS PRODUCTION, P243
[7]  
Goyal S. K., 1973, Management Science, V19, P1322, DOI 10.1287/mnsc.19.11.1322
[8]   LOT SIZE SCHEDULING ON A SINGLE MACHINE FOR STOCHASTIC DEMAND - REPLY [J].
GOYAL, SK .
MANAGEMENT SCIENCE, 1976, 22 (07) :824-825
[9]   SCHEDULING A MULTI-PRODUCT SINGLE MACHINE SYSTEM [J].
GOYAL, SK .
OPERATIONAL RESEARCH QUARTERLY, 1973, 24 (02) :261-269
[10]   SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
HAESSLER, RW ;
HOGUE, SL .
MANAGEMENT SCIENCE, 1976, 22 (08) :909-912