共 10 条
[1]
Abu-Hijleh S.F., Ibbs C.W., Schedule-based construction incentives, J. Constr. Engrg. and Mgmt, 112, 3, pp. 430-443, (1989)
[2]
Christiansen D.L., An analysis of the use of incentive/disincentive contracting provisions for early project completion. Transportation management for major highway reconstruction, Special Report 212, (Proc. Nat. Conf. on Corridor Traffic Mgmt. for Major Highway Reconstruction), (1987)
[3]
Contract time determination, Special Report, 79, (1981)
[4]
Finchum J.A., Expectation of contract incentives, Naval Res. Logistics Q, A, 2, pp. 389-397, (1972)
[5]
Incentive/disincentive early contract completion, (1988)
[6]
Incentive/disincentive (I/D) for early completion, FHWA Technical Advisory. T 5080.10, (1989)
[7]
Memmott J.L., Dudek C.L., QUEWZ-85 Interim report: A model to calculate the road user costs at work zones, (1982)
[8]
Planning and scheduling work zone traffic control, (1981)
[9]
Stukhart G., Contractual incentives, J. Constr. Engrg. and Mgmt, 110, 1, pp. 34-42, (1984)
[10]
Use of incentive/disincentive (l/D) provisions in Alabama, (1990)