SCHEDULING UNIT PROCESSING TIME JOBS ON A SINGLE-MACHINE WITH MULTIPLE CRITERIA

被引:25
作者
CHEN, CL
BULFIN, RL
机构
[1] AUBURN UNIV,DEPT IND ENGN,AUBURN,AL 36849
[2] MISSISSIPPI STATE UNIV,DEPT IND ENGN,MISSISSIPPI STATE,MS 39762
关键词
D O I
10.1016/0305-0548(90)90022-Y
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We examine single machine scheduling problems when all jobs have identical processing times and there are two measures of performance. The measures of performance considered are flow-time, tardiness, number of tardy jobs, the weighted counterparts for these three measures and maximum tardiness. Using the assignment model as a basis, we provide efficient algorithms for the problem when a utility function is given, when one criterion is considered to be primary and the other one secondary. We also develop algorithms that arc polynomial in the number of nondominatcd schedules to generate all nondominated schedules. Finally, we show that the methods can easily be extended to handle more than two criteria, as well as nonzero release dales. © 1990.
引用
收藏
页码:1 / 7
页数:7
相关论文
共 31 条
[1]   BICRITERIA TRANSPORTATION PROBLEM [J].
ANEJA, YP ;
NAIR, KPK .
MANAGEMENT SCIENCE, 1979, 25 (01) :73-78
[2]   AN IMPROVED LOWER BOUND FOR MINIMIZING WEIGHTED COMPLETION TIMES WITH DEADLINES [J].
BAGCHI, U ;
AHMADI, RH .
OPERATIONS RESEARCH, 1987, 35 (02) :311-313
[3]  
Baker K., 1974, INTRO SEQUENCING SCH
[4]  
BALAS E, 1989, MAY CORS ORSA TIMS M
[5]   SIGNATURE METHODS FOR THE ASSIGNMENT PROBLEM [J].
BALINSKI, ML .
OPERATIONS RESEARCH, 1985, 33 (03) :527-536
[7]   SCHEDULING TO MINIMIZE WEIGHTED SUM OF COMPLETION TIMES WITH SECONDARY CRITERIA [J].
BURNS, RN .
NAVAL RESEARCH LOGISTICS, 1976, 23 (01) :125-129
[8]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[9]   NOTE ON A SCHEDULING PROBLEM WITH DUAL CRITERIA [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :615-616
[10]  
FRENCH S, 1986, SQUENCING SCHEDULING