A MODIFIED SHIFTING BOTTLENECK PROCEDURE FOR JOB-SHOP SCHEDULING

被引:68
作者
DAUZEREPERES, S
LASSERRE, JB
机构
[1] Laboratoire d'Automatique et d'Analyse des Systemes du CNRS, Toulouse Cedex, 31077
关键词
D O I
10.1080/00207549308956766
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We propose a modified version of the Adams et al. shifting bottleneck (SB) procedure for job-shop scheduling. By modifying Carlier's algorithm extensively used in the SB procedure, we eliminate some drawbacks. Computational results are reported with good performances, particularly on the classical 10-10 and 5-20 problems.
引用
收藏
页码:923 / 932
页数:10
相关论文
共 10 条
[1]  
Adams J., Balas E., Zawack D., The shifting bottleneck procedure for job shop scheduling, Management Science, 34, pp. 391-401, (1988)
[2]  
Carlier J., The one-machine sequencing problem, European Journal of Operational Research, 11, pp. 42-47, (1982)
[3]  
Carlier J., Pinson E., An algorithm for solving the job-shop problem, Management Science, 35, pp. 164-176, (1989)
[4]  
Dauzere-Peres S., Lasserre J.-B., A Modified Shifting Bottleneck Procedure for Job Shop Scheduling, (1990)
[5]  
Fisher H., Thompson G.L., Probabilistic learning combinations of local job-shop scheduling rules, Industrial Scheduling, pp. 225-251, (1963)
[6]  
Lageweg B.J., Lenstra J.K., Rinnooy Kan A., Job-shop scheduling by implicit enumeration, Management Science, 24, pp. 441-450, (1977)
[7]  
Lawler E.L., Lenstra J.K., Rinnooy Kan A., Shmoys D.B., Sequencing and Scheduling: Algorithms and Complexity, (1989)
[8]  
McMahon G., Florian M., On scheduling with ready times and due dates to minimize maximum lateness, Operations Research, 23, pp. 475-482, (1975)
[9]  
Potts C.N., Analysis of a heuristic for one machine sequencing with release dates and delivery times, Operations Research, 28, pp. 1436-1441, (1980)
[10]  
Roy B., Sussman B., Les Problemes D'ordonnancernent Avec Contraintes Disjonctives, (1964)