AN ACCURATE MODEL FOR SHORT-TERM LOAD FORECASTING

被引:13
作者
ABOUHUSSIEN, MS
KANDIL, MS
TANTAWY, MA
FARGHAL, SA
机构
[1] MANSOURA UNIV,DEPT ELECT ENGN,MANSOURA,EGYPT
[2] MANSOURA UNIV,DEPT ELECT POWER & MACHINE,MANSOURA,EGYPT
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1981年 / 100卷 / 09期
关键词
D O I
10.1109/TPAS.1981.316967
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:4158 / 4165
页数:8
相关论文
共 8 条
[1]   SHORT-TERM LOAD FORECASTING USING GENERAL EXPONENTIAL SMOOTHING [J].
CHRISTIAANSE, WR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1971, PA90 (02) :900-+
[2]  
DAVIES M, 1958, IEEE P C, V106, P27
[3]   IDENTIFICATION OF STOCHASTIC ELECTRIC LOAD MODELS FROM PHYSICAL DATA [J].
GALIANA, FD ;
HANDSCHIN, E ;
FIECHTER, AR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1974, AC19 (06) :887-893
[4]   ADAPTIVE SHORT-TERM FORECASTING OF HOURLY LOADS USING WEATHER INFORMATION [J].
GUPTA, PC ;
YAMADA, K .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, 91 (05) :2085-&
[5]  
LIJENSEN PP, 1971, IEEE T POWER APPARAT, V90, P1757
[6]   SHORT-TERM LOAD FORECASTING USING MULTIPLE CORRELATION MODELS [J].
SRINIVASAN, K ;
PRONOVOST, R .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, 94 (05) :1854-1858
[7]  
TANTAWY MA, 1977, 1976 JAHR BER FORSCH
[8]   EFFECTS OF UNCERTAINTIES IN FORCED OUTAGE RATES AND LOAD FORECAST ONN LOSS-OF-LOAD PROBABILITY (LOLP) [J].
WANG, L .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1977, 96 (06) :1920-1927