SCHEDULING FLEXIBLE FLOW LINES WITH NO IN-PROCESS BUFFERS

被引:24
作者
SAWIK, TJ
机构
[1] Department of Computer Integrated Manufacturing, University of Mining and Metallurgy, Krakow
关键词
D O I
10.1080/00207549508930214
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An heuristic algorithm is proposed for scheduling a flexible flow line with no intermediate buffers. The line is made up of several processing stages in series, where each stage has one or more identical parallel machines. In the line different part types can be manufactured simultaneously, each of which is processed by at most one machine in every stage. Intermediate queues of parts waiting between the stages for their next operations are not allowed. The problem objective is to minimize the makespan of the schedule for a set of part types selected for processing. The algorithm proposed is a part-by-part heuristic, in which during every iteration a complete processing schedule is determined for one part type selected for loading into the line. The selection of the part type and its complete schedule are based on the cumulative partial schedule obtained for all parts selected so far. The decisions in every iteration are made using a local optimization procedure aimed at minimizing total blocking and waiting time of the machines along the route of the selected part type. The efficiency of the algorithm is tested on several groups of random test problems.
引用
收藏
页码:1357 / 1367
页数:11
相关论文
共 15 条
[1]  
Brah S.A., Hunsucker J.L., Branch and bound algorithm for the f1owshop with multiple processors, European Journal of Operational Research, 51, pp. 88-99, (1991)
[2]  
Dutia S.K., Cunningham A.A., Sequencing two-machine flow-shops with finite intermediate storage, Management Science, 21, pp. 989-996, (1975)
[3]  
Gangadharan R., Rajendran C., Heuristic algorithms for scheduling in the no-wait flowshop, International Journal of Production Economics, 32, pp. 285-290, (1993)
[4]  
Gupta J., Tunc E.A., Schedules for a two-stage hybrid f1owshop with parallel machines at the second stage, International Journal of Production Research, 29, pp. 1489-1502, (1991)
[5]  
Leisten R., Flowshop sequencing problems with limited buffer storage, International Journal of Production Research, 28, pp. 2085-2100, (1990)
[6]  
McNaughton R., Scheduling with deadlines and loss functions, Management Science, 6, pp. 1-12, (1959)
[7]  
Narasimhan S.L., Panwalkar S.S., Scheduling in a two-stage manufacturing process, International Journal of Production Research, 22, pp. 555-564, (1984)
[8]  
Narasimhan S.L., Mangiameli P.M., A comparison of sequencing rules for a two-stage hybrid flowshop, Decision Sciences, 18, pp. 250-265, (1987)
[9]  
Sawik T.J., Hierarchical scheduling two-stage multi-machine production with finite intermediate storage, UMM Scientific Bulletin of Automatics, 32, pp. 373-383, (1982)
[10]  
Sawik T.J., Multilevel scheduling of multistage production with limited in-process inventory, Journal of Operational Research Society, 38, pp. 651-664, (1987)