DEVELOPING PRODUCTION SCHEDULES WHICH BALANCE PART USAGE AND SMOOTH PRODUCTION LOADS FOR JUST-IN-TIME PRODUCTION SYSTEMS

被引:41
作者
MILTENBURG, GJ [1 ]
GOLDSTEIN, T [1 ]
机构
[1] CALIF STATE UNIV FULLERTON,SCH BUSINESS ADM & ECON,FULLERTON,CA 92634
关键词
D O I
10.1002/nav.3800380608
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A mixed-model multilevel manufacturing facility running under a just-in-time (JIT) production system is controlled by setting the production schedule for the highest level in the facility, which is usually a mixed-model final assembly line. The schedule is set to achieve the goals of the organization, which under JIT are (1) to keep a constant rate of part usage, and (2) to maintain a smooth production load. In this article we extend earlier work in the literature, which focused on the first goal, by developing scheduling procedures which satisfy both goals. Properties of the resulting production schedules are analyzed and illustrative examples are presented.
引用
收藏
页码:893 / 910
页数:18
相关论文
共 17 条
[1]  
Dar-El E.M., 1975, INT J PROD RES, V13, P463, DOI DOI 10.1080/00207547508943016
[2]  
DARLEL EM, 1978, OMEGA, V6, P313
[3]  
GROEFLIN H, INT J PROD RES, V27, P199
[4]  
HALL RW, 1983, 0 INVENTORIES
[5]  
Huang P. Y., 1983, Decision Sciences, V14, P326, DOI 10.1111/j.1540-5915.1983.tb00189.x
[6]   KANBAN, MRP, AND SHAPING THE MANUFACTURING ENVIRONMENT [J].
KRAJEWSKI, LJ ;
KING, BE ;
RITZMAN, LP ;
WONG, DS .
MANAGEMENT SCIENCE, 1987, 33 (01) :39-57
[7]  
LEE LC, 1987, INT J PROD RES, V25, P1415, DOI 10.1080/00207548708919923
[8]  
MILTENBURG GJ, IN PRESS IIE T
[9]   A DYNAMIC-PROGRAMMING ALGORITHM FOR SCHEDULING MIXED-MODEL, JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J ;
STEINER, G ;
YEOMANS, S .
MATHEMATICAL AND COMPUTER MODELLING, 1990, 13 (03) :57-66
[10]   LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J .
MANAGEMENT SCIENCE, 1989, 35 (02) :192-207