共 14 条
[1]
Aanen E., Planning and Scheduling in a Flexible Manufacturing System, Phd Thesis, Faculty of Mechanical Engineering, (1988)
[2]
Aanen E., Gaalman G.J., Nawijn W.M., Planning and scheduling in an FMS, Engineering Costs and Production Economics, 17, pp. 89-97, (1989)
[3]
Baker K.R., Introduction to Sequencing and Scheduling, (1974)
[4]
Bellman R., Esogbue A.O., Nabeshima I., Mathematical Aspects of Scheduling and Applications, (1982)
[5]
Corwin B.D., Esogbue A.O., Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach, Naval Research Logistics Quarterly, 21, pp. 515-524, (1974)
[6]
Giffler B., Thompson G.L., Algorithms for solving production scheduling problems, Operations Research, 8, pp. 487-503, (1960)
[7]
Gupta N.D., Darrow P., The two-machine sequence dependent flowshop scheduling problem, European Journal of Operational Research, 24, pp. 439-446, (1960)
[8]
Held M., Karp R.M., The traveling-salesman problem and minimum spanning trees, Operations Research, 18, pp. 1138-1162, (1970)
[9]
Johnson S.M., Optimal two- and three-stage production schedules with set-up times included, Naval Research Logistics Quarterly, 1, pp. 61-68, (1954)
[10]
Rinnooy Kan A.H., Machine Scheduling Problems