共 11 条
[1]
Bard, Golany, Determining the Number of Kanbans in a Multiproduct, Multistage Production System, International Journal of Production Research, 29, pp. 881-896, (1991)
[2]
C.A.C.I., SIMSCRIPT II.5 Programming Language, (1983)
[3]
Johri, Lipper, Sengupta, Modeling and Analysis of Production Line With Finite Buffers and Machines Subject to Breakdown, R.A.I.R.O. APII, 19, pp. 471-483, (1985)
[4]
Johri, A Linear Programming Approach to Capacity Estimation of Automated Production Lines With Finite Buffers, International Journal of Production Research, 25, pp. 851-867, (1987)
[5]
Johri, Iterative Algorithms for Estimating the Capacity of Automated Production Lines With Finite Buffers, International Hournal of Production Research, 27, pp. 687-699, (1989)
[6]
Johri, A Heuristic Algorithm for Loading New Work on Circuit Pack Assembly Lines, International Journal of Production Research, 28, pp. 1871-1883, (1990)
[7]
Kochhar, Morris, Heuristic Methods for Flexible Flow Line Scheduling, Journal of Manufacturing Systems, 6, pp. 299-314, (1987)
[8]
Kusiak, Wilhelm, Analysis Modelling and Design of Modern Production Systems, Annals of Operations Research, 17, (1989)
[9]
Wittrock, Scheduling Algorithms for Flexible Flow Lines, IBM Journal of Research & Development, 29, pp. 401-412, (1985)
[10]
Wittrock, An Adaptable Scheduling Algorithm for Flexible Flow Lines, Operations Research, 36, pp. 445-453, (1988)