共 12 条
[1]
ARAFEH SA, 1975, APR MILW S AUT CONTR
[2]
INTERCHANGE CAPABILITY AND CONTINGENCY EVALUATION BY A Z-MATRIX METHOD
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1972, 91 (05)
:1827-&
[3]
IBRAHIM SA, 1974, THESIS U SASKATCHEWA
[4]
MESAROVIC MD, 1970, THEORY HIERARCHIAL M
[5]
SENSITIVITY IN POWER SYSTEMS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1968, PA87 (08)
:1687-+
[6]
ITERATIVE LINEAR AC-POWER FLOW SOLUTION FOR FAST APPROXIMATE OUTAGE STUDIES
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1972, 91 (05)
:2048-&
[7]
FAST APPROXIMATE TECHNIQUE FOR OUTAGE STUDIES IN POWER-SYSTEM PLANNING AND OPERATION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1974, PA93 (04)
:1133-1142
[8]
STAGG GW, 1970, JUL IEEE POW M EHV C
[9]
STOTT B, 1973, JUL IEEE POW ENG SOC
[10]
OPTIMAL RESCHEDULING OF POWER FOR SYSTEM RELIABILITY
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1971, PA90 (05)
:2186-&