共 11 条
[1]
Aronson J.E., Two heuristics for the deterministic single operator, multiple machine, multiple run cyclic scheduling problem, Journal of Operations Management, 4, pp. 159-173, (1984)
[2]
Bunday B.D., Khorram E., A closed form solution for the G/M/r machine interference model, International Journal of Production Research, 26, pp. 1811-1818, (1988)
[3]
Bunday B.D., Scraton R.E., The G/M/r machine interference model, European Journal of Operational Research, A, pp. 399-402, (1980)
[4]
Dubf R., Elsayed E.A., A multi-machine labor assignment for variable operator service times, Computers and Operations Research, 6, pp. 147-154, (1979)
[5]
Eden C.L., Rules for scheduling semi-automatic machines with deterministic cycle times, International Journal of Production Research, 13, pp. 41-55, (1975)
[6]
Elsayed E.A., An optimum repair policy for the machine interference problem, Journal of the Operational Research, 32, pp. 793-801, (1981)
[7]
Elsayed E.A., Norton J., Machine interference in automated cells, Annals of Operations Research, 9, pp. 449-468, (1987)
[8]
Gross D., Ince J.F., The machine repair problem with heterogeneous populations, Operations Research, 29, pp. 532-549, (1981)
[9]
Koulamas C.P., Smith M., Look-ahead scheduling for minimizing machine interference, International Journal of Production Research, 26, pp. 1523-1533, (1988)
[10]
Maritas D.G., Xirokostas D.A., The M/Ek/r machine interference model, European Journal of Operational Research, 1, pp. 112-123, (1977)