NEW SYNCHRONOUS COMPENSATORS FOR THE NELSON RIVER HVDC SYSTEM - PLANNING REQUIREMENTS AND SPECIFICATION

被引:22
作者
THIO, CV
DAVIES, JB
机构
[1] Manitoba Hydro, Winnipeg, Manitoba
关键词
D O I
10.1109/61.131152
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The first units of Limestone Generating Station, the third plant on the Lower Nelson River in northern Manitoba, will come into service in the fall of 1990. Additional var compensation equipment is required at the inverter end of the Nelson River HVdc system to accommodate power from Limestone. This paper describes the system requirements of and the overall specification for the synchronous compensators selected to supply the reactive power and voltage support.
引用
收藏
页码:922 / 928
页数:7
相关论文
共 2 条
[1]  
DAVIES JB, 1984, JUN INT C DC POW T, P86
[2]  
GAVRILOVIC A, 1987, SEP CIGRE S AC DC T