共 13 条
[1]
Conway R., Maxwell W.L., Miller L.W., Theory of Scheduling, (1967)
[2]
Garey M.R., Johnson D.S., Computers and Intractability: A Guide to the Theory of N P-Completeness, (1979)
[3]
Hirabayashi R., Suzuki H., Tsuchiya N., Optimal tool design problem for NC machine tools, Journal of the Operations Research Society of Japan, 27, pp. 205-228, (1984)
[4]
Hwang S.S., A constraint-directed method to solve the part selection problem in FMS planning stage, Proceedings of the Second Orsa/Tlms Conference on Flexible Manufacturing Systems (Ann Arbor, MI), pp. 297-309, (1986)
[5]
Rajagopalan S., Formulation and heuristic solution for parts grouping and tool loading in flexible manufacturing systems, Proceedings Ofthe Second Orsa/Tlms Conference on Flexible Manufacturing Systems (Ann Arbor, MI), pp. 311-320, (1986)
[6]
Sarin S.C., Chen C.S., The machine loading and tool allocation problem in a flexible manufacturing system, International Journal of Production Research, 25, pp. 1081-1094, (1987)
[7]
Stecke K.E., Formulation and solution of non linear integer production planning problems for flexible manufacturing systems, Management Science, 29, pp. 273-288, (1983)
[8]
Stecke K.E., Kim I., A study of FMS part type selection approaches for short-term production planning, International Journal of Production Research, 25, pp. 1081-1094, (1988)
[9]
Stecke K.E., Kim J., Aflexible approach to part type selection in flexible flow systems, International Journal of Production Research, 29, pp. 53-75, (1991)
[10]
Svetska J.A., Imposing precedence constraints on NC punch press sequences, International Journal of Production Research, 28, pp. 2309-2319, (1990)