共 41 条
[1]
Adams J., Balas E., Zawack D., The shifting bottleneck procedure for job shop scheduling, Management Science, 34, pp. 391-401, (1988)
[2]
Ahmadi R.H., Tano C.S., An operation partitioning problem for automated assembly system design, Operations Research, 39, pp. 824-835, (1991)
[3]
Balas E., Machine sequencing via disjunctive graphs: An implicit enumeration algorithm, Operations Research, 17, pp. 941-957, (1969)
[4]
Barnes J.W., Laguna M., A tabu search cxpcricncc in production scheduling, Annals of Operations Research, 41, pp. 141-156, (1993)
[5]
Blasewicz J., Cellary W., Slowinski R., Weglarz J., Scheduling under resource constraints-dctcrministic models, Annals of Operations Research, 7, (1986)
[6]
Bowman V.J., On the relationship of the Tchebycheflf norm and the efficient frontier of multiplc-critcria problems, Multiple Criteria Decision Making, 130, pp. 76-86, (1975)
[7]
Brandimarte P., Neighbourhood search-based optimization algorithms for production scheduling: A survey, Computer-Integrated Manufacturing Systems, 5, pp. 167-176, (1992)
[8]
Brandimarte P., Routeing and scheduling in a flexible job shop by tabu search, Annals of Operations Research, 41, pp. 157-183, (1993)
[9]
Brandimarte P., Ukovich W., Villa A., Factory level aggregate scheduling: A basis for a hierarchical approach, Proceedings of the 3Rd IEEE Conference on CIM, pp. 413-422, (1992)
[10]
Carraway R.L., Chambers R.J., Morin T.L., Moskowitz H., Single machine sequencing with nonlinear multicriteria cost functions: An application of generalized dynamic programming, Computers and Operations Research, 19, pp. 69-77, (1992)