We consider a single facility dedicated to the production of a family of items where the policy used is to cycle production through the items every T units of time. This is known as the Common Cycle or Rotation Schedule and is a special case of the Economic Lot Scheduling Problem (ELSP). We consider the case in which the production rates can be reduced from known maximum rates. Moreover, we assume that production rates can be changed during the production runs. We optimally partition the items into those with high and low holding costs. The former are initially produced to meet demand while the latter are always produced at their maximum rates. Numerical examples indicate savings almost twice as large as those reported in the literature.
引用
收藏
页码:2459 / 2470
页数:12
相关论文
共 15 条
[1]  
Arizono I., Yokoi S., Ohta H., The effects of varying production rates on inventory control, Journal of Operational Research Society, 40, pp. 789-796, (1989)
[2]  
Bombkrger E., A dynamic programming approach to a lot size scheduling problem, Management Science, 12, pp. 778-784, (1966)
[3]  
Dorson G., The economic lot-scheduling problem: Achieving feasibility using time- varying tot sizes, Operations Research, 35, pp. 764-771, (1987)
[4]  
Drkzner Z., Schaible S., Simchilevi D., Queueing-Location problems on the plane, Naval Research Logistics, 37, pp. 929-935, (1990)
[5]  
Eimaghrauy S., The economic lot scheduling problem (ELSP): Review and extensions, Management Science, 24, pp. 587-598, (1978)
[6]  
Gallego G., Scheduling the production of several items with random demands in a single facility, Management Science, 36, pp. 1579-1592, (1990)
[7]  
Gallego G., Reduced Production Rates in the Economic Lot Scheduling Problem, (1989)
[8]  
Gallego G., Moon I., The Effect of Externalizing Setups in the Economic Lot Scheduling Problem, (1989)
[9]  
Gauego G., Moon I., Strategic Investment to Reduce Setup Times in the Economic Lot Scheduling Problem, (1990)
[10]  
Inman R., Jones P., Economic Lot Scheduling with Change-Overs Or Reducible Production Rates, (1989)