SOFTWARE EFFORT MODELS FOR EARLY ESTIMATION OF PROCESS-CONTROL APPLICATIONS

被引:34
作者
MUKHOPADHYAY, T
KEKRE, S
机构
[1] Graduate School of Industrial Administration Carnegie Mellon University, Pittsburgh, PA
关键词
CONSTRUCTIVE COST MODEL; EARLY ESTIMATION; FUNCTION POINTS; PROCESS CONTROL APPLICATIONS; SOFTWARE COST;
D O I
10.1109/32.163607
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Existing software effort models have severe limitations for early use in the software development lifecycle. We develop models to estimate lines of code and function counts directly from user application features of process control systems. Since the application features are known with reasonable degree of confidence during early stages of development, we are able to extend the use of the Constructive Cost Model (COCOMO) and function points based approach for early software cost estimation. We also develop alternative feature-based models that estimate size and effort using application features and productivity factors. At our research site, the feature-based models estimate software effort with the least error.
引用
收藏
页码:915 / 924
页数:10
相关论文
共 28 条
[1]  
ABDELHAMID T, 1986, IEEE SOFTWARE JUL, P69
[2]   SOFTWARE FUNCTION, SOURCE LINES OF CODE, AND DEVELOPMENT EFFORT PREDICTION - A SOFTWARE SCIENCE VALIDATION [J].
ALBRECHT, AJ ;
GAFFNEY, JE .
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1983, 9 (06) :639-648
[3]  
ALBRECHT AJ, 1984, DOCUMENT NUMBER CIS, V313
[4]  
Bailey J. W., 1981, 5th International Conference on Software Engineering, P107
[5]  
BANEKR RD, 1991, MANAGE SCI, V37, P1
[6]  
BANKER R, 1987, 8TH P INT C INF SYST, P160
[7]  
BANKER RD, 1989, 10TH P INT C INF SYS, P247
[8]  
BARBACCI MR, 1985, IEEE SOFTWARE NOV, P4
[10]  
Boehm B.W., 1981, SOFTWARE ENG EC