VALUATION OF PATH-DEPENDENT CONTINGENT CLAIMS WITH MULTIPLE EXERCISE DECISIONS OVER TIME - THE CASE OF TAKE-OR-PAY

被引:45
作者
THOMPSON, AC
机构
[1] Department of Finance, College of Business Administration, University of Houston, Houston
关键词
D O I
10.2307/2331121
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Hull and White (1993) introduced a method to extend lattice-based contingent claim valuation techniques to problems with path-dependent payoffs. This paper builds upon their method in the process of valuing two types of commodity purchase contracts that exhibit a form of timing flexibility not previously analyzed in the literature. The techniques demonstrated take advantage of characteristics of claims that simplify incorporation of path dependencies. Possible uses for the methods demonstrated include the valuation of: portfolios of mortgages, capital projects where intensity of use affects productivity of the asset, and capital projects with storage characteristics.
引用
收藏
页码:271 / 293
页数:23
相关论文
共 27 条
[1]  
[Anonymous], 1986, J LAW ECON ORGAN
[3]  
BRENNAN MJ, 1958, AM ECON REV, V48, P50
[4]   EVALUATING NATURAL-RESOURCE INVESTMENTS [J].
BRENNAN, MJ ;
SCHWARTZ, ES .
JOURNAL OF BUSINESS, 1985, 58 (02) :135-157
[5]  
BRENNAN MJ, 1991, STOCHASTIC MODELS OP, P34
[6]   NONPRICE PROVISIONS IN LONG-TERM NATURAL-GAS CONTRACTS [J].
BROADMAN, HG ;
TOMAN, MA .
LAND ECONOMICS, 1986, 62 (02) :111-118
[7]  
BROADMAN HG, 1983, NATURAL GAS MARKETS
[8]  
Canes M. E., 1984, J ENERGY DEV, V10, P73
[9]   OPTION PRICING - SIMPLIFIED APPROACH [J].
COX, JC ;
ROSS, SA ;
RUBINSTEIN, M .
JOURNAL OF FINANCIAL ECONOMICS, 1979, 7 (03) :229-263
[10]   MITIGATING CONTRACTUAL HAZARDS - UNILATERAL OPTIONS AND CONTRACT-LENGTH [J].
CROCKER, KJ ;
MASTEN, SE .
RAND JOURNAL OF ECONOMICS, 1988, 19 (03) :327-343