共 11 条
[1]
Antill J.M., Critical path methods in construction practical, (1982)
[2]
Fondahl J.W., A non-computer approach to the critical path method for the construction industry, Tech. Rep. No.9, (1961)
[3]
Harris R.B., Precedence and arrow networking techniques for construction, (1978)
[4]
Kelly J.E., Critical path planning and scheduling: Mathematical basis, Oper. Res, 9, 3, pp. 296-320, (1961)
[5]
Meyer W.L., Shaffer L.R., Extensions of the critical path method through the application of integer programming, Civ. Engrg. Constr. Res. Series No.2, (1963)
[6]
Moselhi O., Schedule compression using the direct stiffness method, Can. J. Civ. Engrg, 20, 1, pp. 65-72, (1993)
[7]
Patterson J.H., Huber D., A horizon-varying, zero-one approach to project scheduling, Mgmt. Sci, 20, 6, pp. 990-998, (1974)
[8]
Prager W., A structural sethod of computing project cost polygons, Mgmt. Sci, 9, 3, pp. 394-404, (1963)
[9]
Reda R.M., Carr R.I., Time-cost trade-off among related activities, J. Constr. Engrg. and Mgmt, 115, 3, pp. 475-486, (1989)
[10]
Robinson D.R., A dynamic programming solution to cost-time trade-off for CPM, Mgmt. Sci, 22, 2, pp. 158-166, (1975)